Project:
Forge River Wastewater Treatment Plant
Project Scope:
Fire Alarm (FA)
Partner:
Simplex
Vertical:
Industrial
Scope (FA):
Redeveloped the original engineered fire alarm system design and calculations after identifying critical errors and omissions in the initial submittal package.
Managed the implementation of a three-building networked fire alarm system utilizing an ES Net star topology.
Project involved hazardous-area-rated (explosion-proof) Fire Alarm devices within sewage processing environments, and required detailed coordination with project electrical contractor. Facilitated plan for Fire Alarm interface with site-specific operational systems and corresponding sequences.
