Project:
Westhill High School
Scope (ERCES)
APPLICABLE FREQUENCY AND DONOR SITE VERIFICATION
Coordinated with Stamford Fire District and Connecticut Division of Statewide Telecommunications (CTS) Unit to request and verify applicable system types, frequencies, and locations.
EQUIPMENT LOCATION AND RATED PATHWAY VERIFICATION
Reviewed architectural life safety plans to identify 2-hour rated spaces and pathways suitable for ERRCS active components and backbone equipment.
Associated markups and supporting documentation related to equipment locations and rated pathway verification
PRELIMINARY BUILDING MODEL
Created a preliminary iBwave building materials model using architectural contract documents, incorporating building-specific details such as auditorium construction, pool and gymnasium finishes, as well as Low-E and security glazing where applicable.
SUPPLEMENTARY SPECIFICATION
Developed a supplementary specification in accordance with the requirements outlined in the CTS CLMRN Interim Emergency Responder Radio Coverage Enhancement Technical Advisory Bulletin and the 2022 Connecticut State Fire Safety Code.
Incorporated detailed sequencing of system delivery phases, including RF modeling, signal benchmarking, equipment integration, commissioning, and final acceptance testing
